Client

John Holland Country Rail Network

Project:   Timber Bridge Replacement Projects – Watermain Relocation

Location

Mittagong, NSW.

Details

Supply and install 156m x 315mm PN16 HDPE waterman in rock under the ARTC rail easement. Connect the newly installed underground watermain to existing watermain so the timber bridge can be dismantled and replaced.