Install and weld various HDPE water/ sewer mains and casing pipes, the smallest being 110mm to 630mm the largest. The project was to relocate existing water/ sewer mains away from the new highway alignment where design conflicts exist. The bores were completed under the existing highway, waterways and environmentally sensitive area. CCURB completed all Butt-welding, Butt-weld tensile tests and hydrostatic pressure test after the water/ sewer main installation completion. CCURB completed all liquid waste management and removal from site.